Industrial HVAC Upgrade

Pennsauken Packing Company

Pennsauken, NJ

Design-Build HVAC to improve air changes and spot cooling in an operational processing plant with extreme heat loads

Completed
2018Q2
Duration
3 months
Cost
$1.1m

Scope Highlights

  • Added 224,000 CFM in addition to existing system with seven (7) additional MAUs and associated ductwork distribution
  • Structural steel rooftop supports were designed for and installed with minimal disruption to operation of plant below
  • Packaged rooftop units were installed in select areas with dedicated ductwork and high velocity nozzles to operator areas to provide spot cooling and heating
  • HVAC controls were integrated into existing BMS platform for conformance with standards of operation