HPP & Cold Fill

LiDestri Foods

Rochester, NY

Conversion of 27,310 sf of ambient warehouse space to support the installation of a high pressure processing line and two cold-fill processing lines.

Completed
2016Q3
Duration
7 months
(2 phases)
Cost
$11m

Scope Highlights

  • Process utilities to production lines
  • Process room construction (IMP walls, floor drains, floor coatings, wash down ceilings, LED lighting, refrigeration, and HVAC)
  • Conversion of existing loading docks and WIP area to refrigerated cold storage
  • Equipment lines:
    • Hiperbaric 525 (HPP)
    • Juice squeezing and filling line
    • Puree/hummus processing and filling line
    • Steam cooking line
    • Dedicated CIP room
  • Office and production support area build-out